| |
TM 10-3930-664-24
2-155. LIFT AND SIDESHIFT CHAIN REPLACEMENT
This task covers: Removal, Cleaning, Inspection, Installation
INITIAL SETUP:
Tools and Test Equipment:
Personnel Required:
General Mechanics Tool Kit (1, App. E)
2 Personnel
Torque Wrench (32, App. E)
Materials / Parts:
References:
Loctite 242 (20, App. C)
TM 10-3930-664-10
Loctite 271 (26, App. C)
A. REMOVAL
1.
Lower sideshift carrier until it rests on the ground.
While operating the lift function in the "Lower" mode,
have an assistant push down on the freelift chain
roller (1) until cylinder rod (2) has retracted
approximately 2" more.
2.
Loosen jam nuts (6). Remove freelift chain adjuster
(3) from bracket (4) by removing nut (5).
3.
Slide cover up chain to expose freelift chain anchor
(7). Remove anchor from sideshift carrier (8) by
removing screws (9).
4.
Remove hose guard (10) from chain roller (11) by
removing screw (12). Separate freelift chain
assembly (13) from chain roller.
2-411
|