TM 10-3930-664-24 3. INSTALL         SPINE      MANIFOLD      (60)      AND ADAPTERS.    CONNECT  HOSE  ASSEMBLIES (57, 58) AND TUBE ASSEMBLIES (62). a. Install adapters (63) and new O-rings (64) into spine manifold (60). b. Install adapters (59) and new O-rings (61) into spine manifold (60). c. Apply    removable    loctite    to    threads    of screws  (65).    Install  spine  manifold  (60) onto   spine   assembly   using   screws   and washers (66). d. Connect      tube      assemblies      (62)    to adapters (63). e. Connect    hose    assemblies    (57,    58)    to adapters (59). f. Install   mud   guard   onto   sideshift   carrier using    attaching    screws,    washers,    and spacers. 4. INSTALL     INTERMEDIATE     RAIL     MANIFOLD (41) AND ADAPTERS. a. Install  adapters  (39,  40,  46,  47,  51)  and new   O-rings   (42,   43,   48,   49,   52)   into intermediate rail manifold (41). NOTE Use  the  same  number  of  washers  (55, 56) between bracket (53) and intermediate rail manifold (41) and between    bracket    (53A)    and    head    of screw  (54)  as  recorded  during  removal of manifold. b. Install  intermediate  rail  manifold  (41)  onto  inner rail using screw (54) and washers (55, 56). 5. CONNECT  HOSE  ASSEMBLIES  (1,  2,  20,  21, 44, 45, 50) TO ADAPTERS. 2-402

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business