| |
TM 10-3930-664-24
WARNING
Floor plate (23) is heavy and awkward. Enlist the help of an assistant when removing to prevent
injury to personnel and damage to components.
3.
CAREFULLY LIFT FLOOR PLATE (23) OFF OF FORKLIFT CHASSIS.
B.
CLEANING
Clean floor plate in accordance with paragraph 1-24.
C.
INSPECTION
Inspect floor plate and related components in accordance with paragraph 1-24.
D.
INSTALLATION
1.
CAREFULLY LIFT FLOOR PLATE (23) UP AND POSITION ONTO FORKLIFT CHASSIS. SECURE USING
BOLTS (19), CLAMP (20), WASHERS (21), AND NUTS (22).
2.
INSTALL HOSES AND HOSE CLAMPS ONTO BOTTOM OF FLOOR PLATE (23).
NOTE
The following clamp procedures are for typical clamp arrangements. Individual clamp assembly
components may vary.
a.
Insert hose into base of two-piece tube clamp (11). Mate clamp halves and install onto bottom of floor plate (23)
using two bolts (17) and cover plate (18). b. Insert hose into base of two-piece tube clamp (14). Mate clamp
halves and install onto bottom of floor plate (23) using two stacking bolts (15) and locking plate (16). c. Insert
hose into base of second two-piece tube clamp (14). Mate clamp halves and attach to first clamp using bolts
(12) and cover plate (13).
d.
Insert hoses into base of two-piece tube clamp (8). Mate clamp halves and install onto bottom of floor plate (23)
using stacking bolt (9) and locking piece (10).
e.
Insert hoses into base of second two-piece tube clamp (8). Mate clamp halves and attach to first clamp using
bolt (6) and cover plate (7).
f.
Insert hose into base of two-piece tube clamp (3. Mate clamp halves and install onto bottom of floor plate (23)
using two stacking bolts (4) and locking plate (5).
g.
Insert hose into base of second two-piece tube clamp (3). Mate clamp halves and attach to first clamp using two
bolts (1) and cover plate (2).
FOLLOW-ON MAINTENANCE:
Install steering selector valve (para 2-122)
Install tool box (para. 2-140)
Install floor mat (para. 2-135)
END OF TASK
2-368
|