| |
TM 10-3930-664-24
2-38. ETHER INJECTOR THERMOSTAT REPLACEMENT
This task covers: Removal, Cleaning, Inspection, and Installation
INITIAL SETUP:
Tools and Test Equipment:
Equipment Condition:
General Mechanics Tool Kit (1, App. E)
Towbar lowered (para. 2-126)
A. REMOVAL
1. Release hood assembly (2) by lifting handle (1).
Open hood assembly.
2. Disconnect electrical lead (3) from ether injector
thermostat (4).
3. Remove ether injector thermostat (4) from engine
head assembly (5).
B. CLEANING
Clean ether injector thermostat in accordance with
paragraph 1-24.
C. INSPECTION
Inspect
thermostat
and
related
components
in
accordance with paragraph 1-24.
D. INSTALLATION
1. Insert ether injector thermostat (4) into engine head
assembly (5).
2. Connect
electrical
lead
(3)
to
ether
injector
thermostat (4).
2-130
|