Click here to make tpub.com your Home Page

Page Title: ASSEMBLY
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-660-24-2
BOOM HOIST CYLINDERS MAINTENANCE - CONTINUED
0311 00
CLEANING
See Cleaning instructions (WP 0316 00).
INSPECTION
See Inspection instructions (WP 0317 00).
ASSEMBLY
1.
Install needle valve (22).
2.
Press one new bushing (24) in cylinder tube (10) and
rod (8).
23
10
3.
Install two snap ring (23) on each new bushing (24).
24
NOTE
Wipe all sealing surfaces on cylinder clean
and dry. Apply film of clean lubricating oil
to all seals as they are installed.
22
4.
Install new seal (20) and rod wiper (21) inside gland
23
(9). Ensure that new seal (20) lip is positioned the
23
24
same way as it was before disassembly.
5.
Install new back-up ring (19) and new O-rings (11 and
18) on outside diameter of gland (9).
8
6.
Slide gland (9) onto rod (8).
7.
Lubricate piston (15) inner diameter with clean lubri-
409-1465
cating oil. Install new O-ring (16) inside bore of piston
(15).
8.
Install tube (17).
0311 00-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business