|
|
TM 10-3930-660-24-2
BRAKE CONTROL VALVE MAINTENANCE - CONTINUED
0299 00
ASSEMBLY - CONTINUED
20.
Install new O-ring (21) on valve and ball assembly
13
(20). Insert valve and ball assembly (20) in valve.
17 19
18 14
21.
Install new cup (18) and new back-up ring (19) in plug
15 16
(13).
20
22.
Install new O-ring (17) on plug (13).
21
23.
Install guide (16), spring (15) and washer (14) in plug
(13).
409-1329
24.
Install plug assembly (13). Torque to 40-50 lb-ft (54-
12
11
68 Nm).
8
10
9
25.
Install new cup (12) and spring (11) on piston (8).
7
Install piston (8).
6
5
4
26.
Install washer (10).
3
2
1
27.
Install retaining ring (9).
28.
Install new O-ring (7), springs (5 and 6), shim or
shims (4) and piston (3).
409-1328
29.
Install new boot (2) and retaining ring (1).
30.
Install brake control valve (WP 0131 00).
31.
Operate brake, check for proper operation and leaks (TM 10-3930-660-10).
END OF WORK PACKAGE
0299 00-6
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |