|
|
TM 10-3930-660-24-2
BOOM EXTEND AND RETRACT CHAINS REPLACEMENT - CONTINUED
0267 00
RETRACT CHAIN INSTALLATION
1.
Position clevis (19) on end of retract chain (20). Install pin (18) and retaining ring (17).
2.
If removal was necessary, install retaining ring (21) on
16
INNER BOOM
pin (18).
15
3.
Install clevis pin (16) through clevis (19) and secure
with new cotter pin (15).
20
19
18
21
17
409-1439
4.
Install inner boom (WP 0262 00).
5.
Adjust retract chain (TM 10-3930-660-20).
END OF WORK PACKAGE
0267 00-4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |