Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-660-24-2
INNER BOOM MAINTENANCE - CONTINUED
0262 00
INSTALLATION - CONTINUED
NOTE
Be sure that hoses and boom electrical cable are properly routed around tensioner.
45.
Install MLRS attachment (WP 0188 00).
46.
Install MLRS attachment cylinder (WP 0185 00).
NOTE
Before performing step 47, check all hydraulic boom functions for proper operation.
Apply loctite to threads of bolts as installed.
47.
If removal was necessary, install retainer (66). Place
2
cover (29) on rear of outer boom (2) and secure with
four bolts (27) and four new lockwashers (28).
29
28
27
66
409-1406
48.
Install transmission cover (WP 0150 00).
49.
Operate boom and check for proper operation (TM 10-3930-660-10).
END OF WORK PACKAGE
0262 00-15

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business