|
|
TM 10-3930-660-24-2
INNER BOOM MAINTENANCE - CONTINUED
0262 00
INSTALLATION - CONTINUED
34.
Connect hoses (13 thru 15) to lines (16 thru 18) at ten-
11
sioner.
10
35.
With retract chain (12) around pulley (4), align pulley
(4) and intermediate boom holes. Install pin (10).
36.
Apply Loctite to capscrew (8).
37.
Install capscrew (8) and new lockwasher (9).
2
NOTE
7
5,6
12
8,9
Tighten nut same number of turns as noted
4
during removal.
38.
Insert clevis (7) into hole in outer boom (2) and secure
with flatwasher (6) and nut (5).
20
19
16,17,18
13,14,15
409-1416
39.
Tighten nut (1) on underside of outer boom (2) to adjust tension of extend chain (3) (WP 0193 00).
40.
Adjust hydraulic hose tension (WP 0194 00).
2
409-1417
3
1
0262 00-13
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |