Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-660-24-1
BOOM HOSE PULLEY REPLACEMENT - CONTINUED
0191 00
INSTALLATION - CONTINUED
5.
Position pulley (20) and pulley support (19) on boom.
NOTE
Capscrews fasten to wear pad on underside of intermediate boom section. Align wear pad as required during
step 6.
Apply loctite to threads of capscrews.
6.
Install with two capscrews (16), two new lockwashers
12,13
14
11
(17) and two flatwashers (18).
7.
Using rope, pull three hydraulic hoses (3) and boom
electrical cable (4) through opening at tensioner (2)
until they are snug around boom hose pulley (20).
Remove rope from hoses (3).
8.
Align extend chain (15) with clevis (14).
9.
Secure extend chain (15) to clevis (14) with clevis pin
(13) and two retainer rings (12).
15
3
4
16
17
18
20
19
409-734
0191 00-5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business