Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-660-24-1
BATTERY CABLES AND TERMINALS MAINTENANCE - CONTINUED
0107 00
INSTALLATION - CONTINUED
NOTE
Clean battery cable clamps and terminals as required with baking soda and water solution with wire brush.
Batteries should be installed so the positive terminal of each battery is oriented toward the left and front of
battery box.
27
11.
Position left-hand battery (15) and right-hand battery
24
(9) in battery box (3).
25
12.
Position battery retaining bar (27) across tops of bat-
teries (9 and 15). Install three retaining bolts (26) from
under the battery box (3).
9
15
3
26
409-384
NOTE
Push retaining bolts up until threads of bolts are positioned through holes in battery retaining bar.
10
13.
Secure battery retaining bar (27) to three retaining
bolts (26) with three washers (25) and nuts (24).
12
4
22
14.
Install STE/ICE-R electrical leads (22 and 23) at
clamps (6 and 12) as tagged.
23
15.
Position two STE/ICE-R electrical leads (23) on
clamp (12).
16.
Secure two STE/ICE-R electrical leads (23) to clamp
(12) with nut (13).
17.
Position STE/ICE-R electrical lead (22) on clamp (6).
6
18.
Secure STE/ICE-R electrical lead (22) to clamp (6)
with nut (4).
409-389
0107 00-8

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business