|
|
TM 10-3930-660-24-1
STARTER RELAY MAINTENANCE- CONTINUED
0081 00
INSTALLATION - CONTINUED
4.
Connect four electrical leads (3) to starter relay (4)
and secure with four new lockwashers (2) and four
nuts (1).
5.
Connect battery cables (WP 0107 00).
4
3
2
3
1
2
1
409-313
TESTING
Disconnect electrical leads from starter relay as described in Removal.
1.
2.
To test relay for proper solenoid operation, apply 24 volts DC to terminals (B and C).
3.
Listen for "click" when voltage is applied. If no "click" is heard, relay is defective and must be replaced. Refer to
Removal and Installation.
4.
To test relay for continuity, apply 24 volts DC to terminals (B and C) of relay.
5.
Connect an ohmmeter across terminals (A and D) of
relay.
6.
Ohmmeter should indicate continuity across terminals
(A and D).
7.
Remove 24 volts DC from terminals (B and C).
A
8.
Ohmmeter should indicate no continuity across termi-
nals (A and D).
D
B
C
409-316
0081 00-3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |