TM 10-3930-660-24-1
GAUGES REPLACEMENT - CONTINUED
0068 00
REMOVAL - CONTINUED
5.
Remove nuts (7), starwashers (8) and gauge electrical leads (6) from terminals of gauge (3) as required. Discard star-
washers.
6.
Remove gauge (3) from instrument panel (1).
7.
Remove two nuts (9), two starwashers (10) and clamp (11) from instrument panel (1). Discard starwashers.
8.
Slide gauge (3) out of mounting hole on instrument panel (1).
INSTALLATION
1.
Slide gauge (3) in through mounting hole on instru-
3
4
ment panel (1).
5
9
10
1
2.
Position clamp (11) on instrument panel (1) and secure
5
with two new starwashers (10) and two nuts (9).
2
3.
Position gauge electrical leads (6) on terminals of
gauge (3) as tagged.
11
4.
Secure gauge electrical leads (6) to gauge (3) with
new starwashers (8) and nuts (7).
87
4
5.
Connect gauge light electrical lead (4) at spade con-
6
nectors (5).
NOTE
Apply loctite to threads of capscrews.
409-268
6.
Lower, align and secure right-hand instrument panel
(1), with four capscrews (2).
7.
Connect battery cables (WP 0107 00).
END OF WORK PACKAGE
0068 00-2
|