Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-660-24-1
TURBOCHARGER OIL LINES REPLACEMENT (152 HP) - CONTINUED
0030 00
INSTALLATION
1.
If elbow (10) was removed, apply loctite to engine
block end of elbow.
2.
Install elbow (10) into engine using a soft head ham-
mer.
3.
If separated, connect tubes (7 and 8) with new clamp
(9). Torque clamp to 6 lb-ft (8 Nm).
4.
Position drain tube assembly parts (7 and 8) on elbow
(10) and install clamp (9). Torque clamp to 6 lb-ft (8
1
Nm).
5.
Install new oil drain gasket (8).
6.
Secure turbocharger oil drain tube assembly parts (7
and 8) with two capscrews (4). Torque capscrews to
2
18 lb-ft (24 Nm).
3
7.
Connect turbocharger oil supply hose (1) to adapter
(3).
8.
Connect turbocharger oil supply hose (1) to turbo-
5
charger (2).
9.
Start engine and check for leaks (TM 10-3930-660-
4
10).
7
9
8
10
6
409-180
END OF WORK PACKAGE
0030 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business