Click here to make tpub.com your Home Page

Page Title: Table 1. Unit Preventive Maintenance Checks and Services (PMCS) for 6K Forklift - Continued.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-660-24-1
UNIT PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) - CONTINUED
0011 00
Table 1. Unit Preventive Maintenance Checks and Services (PMCS) for 6K Forklift - Continued.
Location
Item To
Man-
Check/
Hours
Item No.
Interval
Procedure
Service
NOTE
7
Monthly
Engine
Oil and
Forklift should be parked on level ground with transmission in
Filter
Neutral (N) and locked and parking brake applied. Shut down
engine.
Drain crankcase while oil is warm.
Engine crankcase capacity is 15 qt (14.2 l).
Clean area around fill cap and drain plug before removing.
a. Open right engine access door and remove engine oil fill cap.
b. Under forklift, access right side of oil pan.
c. Remove drain plug and drain oil into a suitable container. Dispose of
drained oil in accordance with local policy and ordinances. Install drain
plug.
d. Open left engine access door and replace engine oil filter element (WP
e. Add oil (Items 31 or 32, WP 0323 00) through oil fill tube until level on
dipstick is between ADD and FILL lines on dipstick.
(OE/HDO)
OIL FILL
DIPSTICK
OIL DRAIN
ENGINE RIGHT SIDE
409-062
0011 00-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business