| |
TM10-3930-660-20
18-32.
BOOM HOIST CYLINDERS - REPLACE (Cont't)
NOTE
If removing both cylinders (2) at the
same time, note that one cylinder (2)
will fully retract before other cylinder
(2) begins to retract. Have assistant
signal operator when both cylinders (2)
are fully retracted.
6.
7.
8.
9.
10.
11.
12.
START ENGINE AND RUN AT FULL
THROTTLE, TM10-3930-660-10.
USING BOOM HOIST JOYSTICK
CONTROL VALVE, FULLY RETRACT CYLINDER
(2).
STOP ENGINE, TM10-3930-660-10.
CAREFULLY LOWER CYLINDER (2), USING
LIFTING DEVICE, UNTIL CYLINDER (2)
IS RESTING ON BOARD PLACED ON MAIN
DECK .
TAG AND DISCONNECT HYDRAULIC LINES
(5 AND 6) FROM CYLINDER PORTS.
REMOVE BOOM HOIST CYLINDER LOWER
PIVOT PIN (7).
a.
b.
Remove locknut (8) and screw (9).
Discard locknut.
Remove lower pivot pin (7), using
suitable pin puller.
MOVE LIFTING DEVICE TO CYLINDERS
BALANCE POINT AND CAREFULLY LIFT
CYLINDER (2) OFF OF VEHICLE.
INSTALLATION
NOTE
Remove caps and plugs as hoses are
installed. Wipe all sealing surfaces on
cylinder and hoses
CAREFULLY LOWER
BOARD PLACED ON
LIFTING DEVICE.
clean and dry.
CYLINDER (2) ONTO
MAIN DECK USING
18-129
|