| |
TM10-3930-660-20
18-23.
BOOM CHAIN PULLEYS - REPLACE (Centd)
5.
6.
7.
SECURE RETRACT CHAIN CLEVIS (3).
Secure retract chain clevis (3) with
washer (2) and nut (1). Tighten nut
(1) until locknut (4) is tight against
boom.
CHECK/ADJUST CHAIN ADJUSTMENT , PARA.
18-24.
CHECK/ADJUST HYDRAULIC HOSES AND
ELECTRICAL CABLE , PARA. 18-25.
REMOVAL - EXTEND CHAIN PULLEY
1. FULLY RETRACT, THEN EXTEND BOOM
SEVERAL INCHES .
Loosen locknut (14) as needed to reduce
chain tension during clevis pin removal.
2.
3.
4.
5.
REMOVE RETAINER RINGS (15) AND
CLEVIS PIN (16); SEPARATE CHAIN FROM
CLEVIS (17).
a. Remove retainer rings (15) and
clevis pin (16) from extend chain
clevis (17).
b. Separate chain (18) from clevis
(17).
LOOSEN HOSE TENSION.
Loosen jamnuts (19).
REMOVE TWO CAPSCREWS (20), TWO
LOCKWASHERS (21), TWO FLATWASHERS
(22), PULLEY SUPPORT (23), AND
PULLEY (24).
a. Remove two Capscrews (20) , two
lockwashers (21), and two
flatwashers (22). Discard
lockwashers (21).
b. Remove pulley support (23), and
pulley (24) to provide workroom.
REMOVE CAPSCREW (25) AND LOCKWASHER
(26). DISCARD LOCKWASHER (26).
18-92
|