| |
TM10-3930-660-20
18-6.
MAIN CONTROL VALVE ASSEMBLY - ADJUST/REPLACE (Contd)
a. Unscrew main relief valve plug
assembly (1).
b. Connect O to 5000 psi pressure
gauge to plug assembly port (2).
c. Remove acorn nut (3) covering
slotted head adjusting screw.
d. While holding adjusting screw,
loosen and back off jam nut (4)
which secures adjusting screw.
2. ADJUST MAIN RELIEF VALVE PRESSURE TO
3,100 psi.
Engine may be operated at idle or full
throttle when performing pressure tests.
a. Start engine, TM10-3930-660-10.
b. Operate boom extend, retract,
hoist or lower function until
hydraulic oil is passing over
relief valve. Continue to hold
hydraulic lever in that position
so oil passes over relief valve
during relief valve adjustment.
c. Turn adjusting screw clockwise
(in) until pressure on gauge reads
3,100 psi.
d. Release hydraulic function lever.
3. ADJUST BOOM EXTEND RELIEF VALVE
PRESSURE BETWEEN 2,950 AND 3,050 psi.
a. Remove acorn nut (5) covering
slotted head adjusting screw.
b. While holding adjusting screw,
loosen and back off jam nut (6)
which secures adjusting screw.
18-22
|