| |
TM10-3930-660-20
18-5.
PISTON PUMP-
TEST/REPLACE (Contd)
4.
5.
REMOVE BLOCKING MATERIAL FROM BOOM.
INSTALL TRANSMISSION COVER,
PARA. 16-6.
CAUTION
Piston pump must be purged of air
before engine is started. Refer to para.
18-3 for purging instructions. Failure
to purge air as directed may result in
severe damage to piston pump.
6. PURGE AIR FROM THE PISTON PUMP,
PARA. 18-3.
TESTING
1.
2.
PREPARE AND SET-UP THE IN-LINE
FLOWMETER. A TEST TEE SHOULD BE
INCLUDED WITH THE FLOWMETER.
MAKE HYDRAULIC CONNECTIONS TO
FLOWMETER.
a.
b.
c*
d.
e.
f.
Tag and disconnect inlet hose (l).
Install test tee fitting from flow
meter in place of inlet hose (1)
at pump (2).
Connect the inlet hose (1) to one
side of the flowmeter test tee.
Connect the other side of the
flowmeter test tee to a hydraulic
hose.
Connect the other end of hydraulic
hose to the fitting on the outlet
port of flowmeter.
Tag and disconnect the pump output
hose (3) from the tee (4) on the
pump (2).
Plug output hose (3) to
prevent dirt from entering the
hose.
Connect a test hose from tee (4)
to a tee at the inlet port of the
flowmeter.
18-15
|