TM10-3930-660-20
8-7.
GAUGES - REPLACE (Contd)
b.
c.
Tag meter electrical leads (6) at
terminals of meter (3) as
required.
Remove nuts (7), starwashers (8)
and meter electrical leads (6)
from terminals of meter (3) as
required.
3. REMOVE METER (3) FROM INSTRUMENT
PANEL (1).
a. Remove two nuts (9) , two
starwashers (10) and clamp (11)
from instrument panel (1).
b. Slide meter (3) out of mounting
hole on instrument panel (1).
INSTALLATION
1. INSTALL METER (3) TO INSTRUMENT PANEL
(1).
a.
b.
Slide meter (3) in through
mounting hole on instrument panel
(1).
Position clamp (11) on instrument
panel (1) and secure with two new
starwashers (10) and two nuts (9).
2. CONNECT ELECTRICAL LEADS AT METER
(3).
a.
b.
c.
Position meter electrical leads
(6) on terminals of meter (3) as
tagged.
Secure meter electrical leads (6)
to meter (3) with new starwashers
(8) and nuts (7).
Connect meter light electrical
lead (4) at spade connectors (5).
3. LOWER AND SECURE
INSTRUMENT PANEL
RIGHT-HAND
(1).
a.
Apply
(2) .
b.
4.
Lower and align right-hand
instrument panel (1).
Loctite 242 to threads of capscrews
Secure right-hand instrument panel
(1) with four capscrews (2).
CONNECT NEGATIVE BATTERY CABLE,
PARA. 8-44.