TM10-3930-660-10 Always  lift  the  load  from  its  resting  spot  before  extending  or  retracting  the boom.  Always  extend  or  retract  the  boom  before  lowering  the  load  to  its resting  spot.  Failure  to  do  so  could  cause  vehicle  instability  and  result  in severe   personal   injury   or   death. g.   Move   the   automatic   fork   level   switch   to   the   OFF   position. h.   After   lifting   the   pod,   operate   the   carriage,   forks,   and   boom   as   necessary   and   slowly   back   the vehicle  away  from  the  container  or  trailer. i.  Transport  the  MLRS  pods  to  desired  location.  If  the  pods  are  to  be  carried  more  than  a  short distance   or   over   rough   terrain,   install   the   load   stabilizers,   paragraph   2-14. NOTE Load  stabilizers  are  marked  “RH”  and  “LH”.  Install  the  load  stabilizer marked  “RH”  to  the  right-hand  side  of  the  fork  carriage.  Install  the  load stabilizer  marked  “LH”  to  the  left-hand  side  of  the  fork  carriage. j.  After  a  MLRS  pod  has  been  moved  to  desired  location,  loosen  the  wing  nuts  on  the  MLRS  lifting tool  and  remove  tool  from  pod.  For  moving  additional  MLRS  pods,  attach  MLRS  lifting  tool  to next  pod,  see  para.  2-12.  Repeat  step  c-j. k.   After   operation,   loosen   the   wing   head   thumbscrews   on   the   stop   tube.   Slide   the   stop   tube   from the  forks.  Place  the  stop  tube  in  storage  area  on  vehicle  deck. 2-37

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business