| |
TM 10-3930-659-34
4-69.
FORK/BOOM ASSEMBLY MAINTENANCE.
This Task Covers:
a.
Removal
c. Assembly
b.
Disassembly
d. Installation
Initial Setup:
Equipment Conditions:
Tools/Test Equipment:
Carriage tilt cylinder fully retracted (see TM 10-3930-
General mechanic's tool kit (Item 71, Appendix E)
659-10).
Hydraulic jack kit (Item 40, Appendix E)
Carriage assembly removed (see TM 10-3930-
Eight seals
659-20).
Fork spacing cylinder hoses and lines removed (see Personnel Required: Three
TM 10-3930-659-20).
References:
TM 10-3930-659-10
TM 10-3930-659-20
a.
REMOVAL I
1.
Attach suitable lifting device to fork/boom
assembly (3). Raise fork/boom assembly,
engage boom lock (see TM 10- 3930-659-20),
and support two lift cylinders (4) with wood
blocks.
TA708428
4-283
|