| |
TM 10-3930-659-34
4-66.
FORKLIFT CONTROL VALVE REPAIR (Cont).
12.
Repeat steps 5 through 11 for carriage tilt valve (8).
13.
Repeat steps 5 through 11 for fork/boom valve (9).
14.
Install new preformed packing (33) and plug (34) on outlet (32).
15.
Install six new preformed packings (6 and 7), fork/boom valve (9), carriage tilt valve (8), fork spacing valve (4),
and outlet (32) on inlet valve (10) with four studs (31), eight washers (11), and nuts (12).
FOLLOW-ON TASKS:
Install forklift control valve (see TM 10-3930-659-20).
4-273
|