TM 10-3930-659-34 4-54.  ACCUMULATOR CHARGING (Con’t). 3. plug    (10)    and    preformed    packing    (11)    from bottom  of  accumulator  (5).    Discard  preformed packing. 4. nitrogen  accumulator  charging  kit  valve  (9)  and hose (8) on accumulator (5).  Tighten nut (6). 5. nitrogen   accumulator   charging   kit   to   pressure regulator on nitrogen cylinder. 6. Open valve on nitrogen cylinder. 7. Slowly  open  nitrogen  accumulator  charging   kit valve (9).  Adjust for a pressure reading of 475- 525 psi (3275-3620 kPa) on pressure gage. 8. turn   nut   (7)   counterclockwise   until   a   pressure reading   of   500   psi   (3448   kPa)   is   reached   on pressure gage. 9. Tighten nut (7) clockwise. 10. Relieve pressure on nitrogen accumulator charging kit. 11. nitrogen  accumulator  charging  kit  valve  (9)  and hose (8) from accumulator (5). 12. new  preformed  packing  (11)  and  plug  (10)  on accumulator (5). 13. steps 3 through 12 for other accumulator. FOLLOW-ON TASKS: Install left transmission side guard (see TM 10-3930-659-20). Remove frame locking bar (see TM 10-3930-659-10). 4-204

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business