| |
TM 10-3930-659-34
4-38.
TORQUE CONVERTER REPLACEMENT.
This Task Covers:
a.
Removal
b.
Installation
Initial Setup:
Equipment Conditions:
Materials/Parts:
Transmission assembly removed (see para-
Rags (Item 43, Appendix B)
graph 4-40).
One locking strap
Two grooved pins
Tools/Test Equipment:
General mechanic's tool kit (Item 71, Appendix E)
Electric drill, portable (Item 20, Appendix E)
Twist drill set (Item 21, Appendix E)
Mechanical puller (Item 51, Appendix E)
Torque wrench, 0-175 lb.-ft. (Item 81, Appendix E)
NOTE
A suitable container should be used to catch any draining hydraulic fluid. Ensure that all spills are
properly cleaned.
a.
REMOVAL
1.
Remove two nuts (6), washers (5), mounting plate (4), two screws (1), and spacers (2) from transmission cover
(3).
4-152
|