TM 10-3930-659-34 4-36. TRANSMISSION PUMP FLOW TEST. This Task Covers: Flow Test Initial Setup: Equipment Conditions: • Frame locking bar installed (see TM 10-3930-659-10). • Right side cab skirt removed (see TM 10-3930-659-20). •  Right  transmission  side  guard  removed  (see  TM  10- 3930-659-20). • Transmission oil filter removed (see TM 10-3930- 659-20). Personnel Required: Two Tools/Test Equipment: •·General mechanic's tool kit (Item 71, Appendix E) • Filter adapter (Item 23, Appendix E) • Hydraulic flowmeter (Item 24, Appendix E) References: • TM 10-3930-659-10 • TM 10-3930-659-20 FLOW TEST 1. Install  filter  adapter  (2)  in  transmission  oil  filter housing (1). 2. Install hydraulic flowmeter inlet hose (3) on top of filter adapter (2). 3. Install   hydraulic   flowmeter   outlet   hose   (6)   on front of filter adapter (2). 4. Check  that  loading  valve  (5)  is  in  full  OPEN position. 5. Start  forklift  truck  and  run  until  transmission  oil temperature   gage   indicates   that   transmission fluid is warm (see TM 10-3930-659-10). 6. Move direction selector lever to N (Neutral) and run engine at fast engine idle speed (see TM 10- 3930-659-10). Note reading on hydraulic flowmeter (4). Minimum allowable flow rate is 9.5 gpm     (36     Ipm).     If     reading     is     not     within specification,    replace    transmission    assembly (see paragraph 4-40). 4-149

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business