| |
TM 10-3930-659-34
4-31.
CONVERTER-OUT FLOW TEST (Cont).
2.
Remove hose (5) and preformed packing (6)
from elbow (7). Discard preformed packing.
3.
Install preformed packing (8), union (9), and
adapter (10) on elbow (7).
4.
Install
preformed
packing
(1
1)
and
hydraulicflowmeter inlet hose (12) on adapter
(10).
5.
Install hose (5) on hydraulic flowmeter (16).
6.
Check that loading valve (15) is in full OPEN
position.
7.
Start forklift truck and run until transmission oil
temperature gage indicates that transmission
fluid is warm (see TM 10-3930-659-10).
4-135
|