| |
TM 10-3930-659-34
4-5.
CYLINDER HEAD ASSEMBLY REPLACEMENT (Cont).
NOTE
Perform steps 5 through 7 in sequence as illustrated.
5.
Torque 26 screws (1) to 35 Ib.-ft. (47 Nm).
6.
Torque 26 screws (1) to 65 Ib.-ft. (88 Nm).
7.
Torque 26 screws (1) to 95 Ib.-ft. (129 Nm).
TORQUE SEQUENCE
FOLLOW-ON TASKS:
Install fuel injection nozzles (see paragraph 4-23).
Install exhaust manifold (see paragraph 4-21).
Install engine rocker arm assembly and pushrods (see paragraph 4-12).
Install engine thermostat housing (see TM 10-3930-659-20).
Install fuel lines and fittings (see TM 10-3930-659-20).
Install fuel filter housing and bracket (see TM 10-3930-659-20).
Install engine high temperature switch (see TM 10-3930-659-20).
Install engine hood (see TM 10-3930-659-20).
TA708065
4-18
|