TM 10-3930-659-34 4-5. CYLINDER HEAD ASSEMBLY REPLACEMENT (Con’t). NOTE Perform steps 5 through 7 in sequence as illustrated. 5. Torque 26 screws (1) to 35 Ib.-ft.  (47 N•m). 6. Torque 26 screws (1) to 65 Ib.-ft.  (88 N•m). 7. Torque 26 screws (1) to 95 Ib.-ft.  (129 N•m). TORQUE SEQUENCE FOLLOW-ON TASKS: Install fuel injection nozzles (see paragraph 4-23). Install exhaust manifold (see paragraph 4-21). Install engine rocker arm assembly and pushrods (see paragraph 4-12). Install engine thermostat housing (see TM 10-3930-659-20). Install fuel lines and fittings (see TM 10-3930-659-20). Install fuel filter housing and bracket (see TM 10-3930-659-20). Install engine high temperature switch (see TM 10-3930-659-20). Install engine hood (see TM 10-3930-659-20). TA708065 4-18

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business