TM 10-3930-659-20
17-21. TRANSMISSION
CLUTCH
CUT
OFF
VALVE-TO-TRANSMISSION
CONTROL
VALVE-
HOSE
REPLACEMENT.
This task covers:
a.
Removal
b.
Installation
INITIAL SETUP:
Equipment Conditions:
Materials/Parts:
Parking brake set (see TM 10-3930-659-10).
Four preformed packings
Frame locking bar installed (see TM 10-3930- Tools/Test Equipment:
659-10).
Right transmission side guard removed (see
General mechanic's tool kit (Item 44, Appendix F)
paragraph 14-7).
Right side cab skirt removed (see paragraph References:
14-6).
TM 10-3930-659-10
a.
REMOVAL
1.
Remove hose (5) and preformed packing (6) from elbow (7).Discard preformed packing.
2.
Remove elbow (7) and preformed packing (8) from transmission clutch cutoff valve (9).Discard preformed
packing.
3.
Remove hose (5) and preformed packing (4) from check valve (3).Discard preformed packing.
4.
Remove check valve (3) and preformed packing (2) from transmission control valve (1).Discard preformed
packing.
b.
INSTALLATION
1.
Install new preformed packing (2) and check valve (3) on transmission control valve (1).
2.
Install new preformed packing (4) and hose (5) on check valve (3).
3.
Install new preformed packing (8) and elbow (7) on transmission clutch cutoff valve (9).
4.
Install new preformed packing (6) and hose (5) on elbow (7).
17-66
|