| |
TM 10-3930-659-20
17-20. FORKLIFT CONTROL VALVE-TO-TRANSMISSION CLUTCH CUTOFF VALVE HOSE REPLACEMENT.
This task covers:
a.
Removal
b.
Installation
INITIAL SETUP:
Equipment Conditions:
Materials/Parts:
Parking brake set (see TM 10-3930-659-10).
Rags (Item 27, Appendix C)
Frame locking bar installed (see TM 10-3930-
Four preformed packings
Right side cab skirt removed (see paragraph References:
14-6).
Tools/Test Equipment:
General mechanic's tool kit (Item 44, Appendix F)
NOTE
A suitable container should be used to catch any draining hydraulic fluid.
Ensure that all spills are properly cleaned.
a.
REMOVAL
1.
Remove hose (6) and preformed packing (5) from adapter (4).Discard preformed packing.
2.
Remove adapter (4) and preformed packing (3) from forklift control valve (2).Discard preformed packing.
3.
Remove hose (6) and preformed packing (7) from adapter (8).Discard preformed packing.
4.
Remove adapter (8) and preformed packing (9) from transmission clutch cutoff valve (1).Discard preformed
packing.
b.
INSTALLATION
1.
Install new preformed packing (9) and adapter (8) on transmission clutch cutoff valve (1).
2.
Install new preformed packing (7) and hose (6) on adapter (8).
3.
Install new preformed packing (3) and adapter (4) on forklift control valve (2).
4.
Install new preformed packing (5) and hose (6) on adapter (4).
17-64
|