TM 10-3930-659-20 CHAPTER 15 HOIST AND CRANE MAINTENANCE Paragraph Page Number Paragraph Title Number 15-1 On-board Crane Maintenance................................................................... 15-1 15-2 On-board Crane Support Cylinder Replacement ....................................... 15-11 15-1. ON-BOARD CRANE MAINTENANCE. This Task Covers: a. Removal d. Assembly b. Disassembly e. Installation c.    Cleaning and Inspection Initial Setup: Equipment Conditions: Materials/Parts: Parking brake set (see TM 10-3930-659-10). •  Gloves (Item 22, Appendix C) •  Rags (Item 27, Appendix C) Tools/Test Equipment: •  Dry cleaning solvent (Item 31, Appendix C) •  Two cotter pins General mechanic's tool kit (Item 44, Appendix F) Personnel Required:  Two References: •  TM 10-3930-659-10 General Safety Instructions: Dry cleaning solvent is flammable and must not be used near open flame.  Use only in a well-ventilated area. 15-1

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business