| |
TM 10-3930-659-20
12-8.
PRIORITY VALVE-TO-MAIN HYDRAULIC PUMP LINE REPLACEMENT.
This Task Covers:
a.
Removal
b.
Installation
Initial Setup:
Equipment Conditions:
Materials/Parts:
Frame locking bar installed (see TM 10-3930-
Rags (Item 27, Appendix C)
659-10).
Three preformed packings
Hydraulic reservoir drained (see LO 10-3930-
659-12)
Right transmission side guard removed (see para-
References:
graph 14-7)
LO 10-3930-659-12
TM 10-3930659-10
Tools/Test Equipment:
General mechanic's tool kit (Item 44, Appendix F)
Adjustable wrench (Item 49, Appendix F)
NOTE
A suitable container should be used to catch any draining hydraulic fluid. Ensure that all
spills are properly cleaned.
a.
REMOVAL
1.
Remove four screws (5), two flanges (3), line (1), and preformed packing (2) from main hydraulic pump (4).
Discard preformed packing.
TA707567
12-26
|