| |
TM 10-3930-659-20
7-15.
TRANSMISSION OIL COOLER HOSES REPLACEMENT.
This task covers:
a.
Removal
b.
Installation
INITIAL SETUP:
Equipment Conditions:
Materials/Parts:
Parking brake set (see TM 10-3930-659-10).
Rags (Item 27, Appendix C)
Conveyorized fork attachments removed from
Ten preformed packings
side of forklift truck (see paragraph 17-13).
Right and left engine upper sideshields opened Tools/Test Equipment
(see TM 1 0-3930-659-10).
Right and left transmission side guards
General mechanic's tool kit (Item 44, Appendix F)
removed (see paragraph 14-7).
Adjustable wrench (Item 49, Appendix F)
Transmission bottom guard removed (see para-
graph 14-8).
References:
Left engine lower sideshield removed (see para-
graph 14-16).
TM 10-3930-659-10
NOTE
A suitable container should be used to catch any draining hydraulic fluid.
Ensure that all spills are properly cleaned.
a.
REMOVAL
1.
Remove hose (23) from tee (12). Drain hydraulic fluid from transmission oil cooler (1).
2.
Remove clamp (24) and hose (23) from transmission oil cooler (1).
3.
Remove hose (21) and preformed packing (22) from transmission thermal bypass valve (8). Discard preformed
packing.
4.
Remove hose (21) and preformed packing (16) from transmission (17). Discard preformed packing.
5.
Remove bolt (19), clamp (20), and hose (21) from transmission (17).
6.
Remove hose (15) from tee (12) and transmission (17).
7.
Remove preformed packing (18) from transmission (17). Discard preformed packing.
8.
Remove hose (3) and preformed packing (4) from transmission oil sampling valve (5). Discard preformed
packing.
9.
Remove clamp (2) and hose (3) from transmission oil cooler (1).
10.
Remove transmission oil sampling valve (5) from adapter (7).
11.
Remove adapter (7) and two preformed packings (6) from transmission thermal bypass valve (8). Discard
preformed packings.
12.
Remove tee (12) from transmission thermal bypass valve (8).
7-46
|