| |
TM 10-3930-659-20
7-1.
TRANSMISSION SHIFT LINKAGE REPLACEMENT (Con't).
b.
INSTALLATION
1.
If removed, install bushing (17) on lever (16).
NOTE
Perform steps 2 through 4 only If rod, yoke, or ball joint was removed.
2.
Install two nuts (21 and 23) on rod (22).
3.
Install ball joint (15) on rod (22) and tighten nut (21) as noted during removal.
4.
Install yoke (24) on rod (22) and tighten nut (23) as noted during removal.
5.
Install assembled transmission shift linkage on lever (16) with screw (14) and nut (18).
6.
If removed, install bushing (12) on lever (10).
NOTE
Perform steps 7 through 9 only If rod, yoke, or ball joint was removed.
7.
Install two nuts (5 and 7) on rod (6).
8.
Install ball joint (8) on rod (6) and tighten nut (7) as noted during removal.
9.
Install yoke (4) on rod (6) and tighten nut (5) as noted during removal.
10.
Install assembled transmission shift linkage on lever (10) with washer (9), screw (13), and nut (11).
11.
Install two levers (10 and 16) and assembled transmission shift linkages on bracket (19) with pivot bolt (20).
12.
Install two pins (3) and new cotter pins (2) on yokes (4 and 24) and transmission control valve (1).
13.
Check position of levers for proper position.
7-4
|