| |
TM 10-3930-659-20
7-1.
TRANSMISSION SHIFT LINKAGE REPLACEMENT (Con't).
1.
Remove two cotter pins (2) and pins (3) from yokes (4 and 24) and transmission control valve (1). Discard cotter
pins.
NOTE
Note position of levers to aid during Installation.
2.
Remove pivot bolt (20) from two levers (10 and 16) and bracket (19), and remove levers and transmission shift
linkages as an assembly.
3.
Remove nut (11), washer (9), screw (13), and assembled transmission shift linkage from lever (10).
NOTE
Perform steps 4 through 6 only if rod, yoke, or ball Joint Is damaged.
Note position of nuts to aid during Installation.
4.
Loosen nut (5) and remove yoke (4) from rod (6).
5.
Loosen nut (7) and remove ball joint (8) from rod (6).
6.
Remove two nuts (5 and 7) from rod (6).
7.
If damaged, remove bushing (12) from lever (10).
8.
Remove nut (18), screw (14), and assembled transmission shift linkage from lever (16).
NOTE
Perform steps 9 through 11 only If rod, yoke, or ball Joint Is damaged.
Note position of nuts to aid during Installation.
9.
Loosen nut (23) and remove yoke (24) from rod (22).
10.
Loosen nut (21) and remove ball joint (15) from rod (22).
11.
Remove two nuts (21 and 23) from rod (22).
12.
If damaged, remove bushing (17) from lever (16).
7-2
|