| |
TM 10-3930-659-20
CHAPTER 7
TRANSMISSION MAINTENANCE
Paragraph
Page
Number
Paragraph Title
Number
7-1
Transmission Shift Linkage Replacement .........................................................................
7-1
7-2
Transmission Shift Linkage Bracket Replacement ............................................................
7-6
7-3
Transmission Shift Rods Replacement ............................................................................
7-8
7-4
Transmission Shift Cables and Ball Joints Replacement...................................................
7-13
7-5
Transmission Shift Linkage Adjustments ..........................................................................
7-16
7-6
Transmission Oil Level Tube Replacement.......................................................................
7-18
7-7
Transmission Suction Tube Replacement .........................................................................
7-20
7-8
Transmission Hydraulic Hoses and Fittings Replacement .................................................
7-22
7-9
Transmission Clutch Cutoff Control Assembly Maintenance .............................................
7-24
7-10
Transmission Clutch Cutoff Valve Pressure Test ..............................................................
7-26
7-11
Transmission Clutch Cutoff Valve Maintenance................................................................
7-30
7-12
Transmission Thermal Bypass Valve Pressure Test .........................................................
7-35
7-13
Transmission Thermal Bypass Valve Maintenance ...........................................................
7-38
7-14
Transmission Oil Cooler Replacement..............................................................................
7-43
7-15
Transmission Oil Cooler Hoses Replacement ..................................................................
7-46
7-16
Transmission Oil Cooler Backflush ...................................................................................
7-50
7-17
Transmission Oil Filter Replacement ................................................................................
7-55
7-18
Transmission Oil Sampling Valve Replacement................................................................
7-56
7-19
Transmission Draining ......................................................................................................
7-58
7-1.
TRANSMISSION SHIFT LINKAGE REPLACEMENT.
This task covers:
a.
Removal
c.
Installation
Initial Setup:
Equipment Conditions:
Materials/Parts:
Parking brake set (see TM 10-3930-659-10).
Two cotter pins
Right side cab skirt removed (see
paragraph 14-6).
References:
Transmission shift cables disconnected from
bell-crank (see paragraph 7-4).
TM 10-3930-659-10
Tools/Test Equipment:
General mechanic's tool kit (Item 44, Appendix F)
7-1
|