| |
TM 10-3930-659-20
6-72.
SECONDARY STEERING WIRING HARNESS MAINTENANCE (Con't).
7.
Install secondary steering wiring harness terminal lead (7) and wire (8) on solenoid (6) with nut (9).
8.
Install secondary steering wiring harness terminal lead (5) on solenoid (6) with nut (10).
9.
Install secondary steering wiring harness terminal lead (4) on solenoid (6) with new lockwasher (3) and nut (2).
10.
Install rubber boot (1) over nut (2).
FOLLOW-ON TASKS:
Close right and left engine upper sideshields (see TM 10-3930-659-10).
Install conveyorized fork attachments to side of forklift truck (see paragraph 17-13).
Connect negative battery cables (see paragraph 6-43).
TA707935
6-280
|