| |
TM 10-3930-659-20
6-68.
STE/ICE BATTERY WIRING HARNESS MAINTENANCE (Con't).
6.
Install two STE/ICE battery terminal leads (11) on shunt (12) with two new lockwashers (10) and screws (9).
7.
Install frame ground terminal lead (8) and STE/ICE battery wiring harness ground terminal lead (5) on frame (7)
with screw (6).
8.
Connect four STE/ICE engine frame wiring harness connectors (4) to STE/ICE alternator, starter motor, and fuel
injection pump wiring harness connectors (3).
6-266
|