| |
TM 10-3930-659-20
6-57.
STE/ICE ALTERNATOR, STARTER MOTOR, AND FUEL INJECTION PUMP WIRING HARNESS
MAINTENANCE. (Con't).
5.
Install cover (28) on alternator (31) with two new
lockwashers (30) and screws (29).
6.
Install four washers (32) and strap (25) on
alternator (31) with two new lockwashers (26)
and screws (27).
7.
Connect STE/ICE alternator, starter motor, and
fuel injection pump wiring harness connector
(23) to engine wiring harness connector (24).
8.
Connect connector (21) to fuel pressure differential switch connector (22).
9.
Connect fuel pressure transducer connector (20) to fuel pressure transducer (19).
TA707859
6-188
|