| |
TM 10-3930-659-20
6-57.
STE/ICE ALTERNATOR, STARTER MOTOR, AND FUEL INJECTION PUMP WIRING HARNESS
MAINTENANCE. (Con't).
14.
Remove locknut (40) and fuel injection pump ter
minal lead (39) from fuel injection pump (41). Discard
locknut.
15.
Remove STE/ICE alternator, starter motor, and
fuel injection pump wiring harness from forklift truck.
c.
INSTALLATION
NOTE
Install clamps and new tie-down straps as necessary.
1.
Position STE/ICE alternator, starter motor, and fuel Injection pump wiring harness on forklift truck.
2.
Install fuel Injection pump terminal lead (39) on fuel injection pump (41) with new locknut (40).
3.
Install two terminal leads (38) on alternator (31) with new lockwasher (37) and nut (36).
4.
Install three terminal leads (33) on alternator (31) with new lockwasher (35) and bolt (34).
TA707858
6-187
|