| |
TM 10-3930-659-20
6-13.
FUSE BLOCK REPLACEMENT (Con't).
2.
Disconnect two fuse block connectors (9 and 12) from STF/ICE load center wiring harness connectors (10 and
11).
3.
Remove four screws (6), nuts (14), and fuse block (5) from load center plate (4).
NOTE
Fuse block has ten 10 amp fuses and six 15 amp fuses. Note location of fuses for
Installation.
4.
Remove 16 fuses (7) from fuse block (5).
NOTE
Fuse block consists of four sections, each fitted into one another.
5.
Disconnect four sections (8) of fuse block (5) as required.
6.
Remove wires and terminals of STE/ICE load center wiring harness (13).
7.
Replace terminals and connectors on wires of STE/ICE load center wiring harness (13) (see paragraph 2-28).
TA707734
6-43
|