TM 10-3930-659-20
6-12.
ELECTRICAL LOAD CENTER REPLACEMENT (Con't).
7.
Install spring clip (22) with screw (18) and nut
(23).
8.
Install flasher (19) on spring clip (22).
9.
Install two load center wiring harness terminal
leads (21) on flasher (19). Tighten two screws
(20).
10.
Install 24-volt module (14) with two screws (16)
and nuts (25).
11.
Connect two 24-volt module connectors (15 and
17) to load center wiring harness connectors (24
and 26).
NOTE
Relays of electrical load center are Installed
the same way. Perform steps 12 and 13 for
each of 11 relays.
12.
Install relay (12) on load center plate (4) with
screw (11) and nut (13).
13.
Connect load center wiring harness connector
(10) to relay (12).
TA707731
6-40
|