| |
TM 10-3930-659-20
5-25.
ENGINE IDLE SPEED AND SPEED CONTROL LINKAGE ADJUSTMENTS.
This task covers:
a.
Removal
b.
Installation
INITIAL SETUP:
Equipment Conditions:
Materials/Parts:
Conveyorized fork attachments removed from
Seal (Item 28, Appendix C)
side of forklift truck (see paragraph 17-13).
Right engine upper sideshield opened (see TM 10
-
Personnel Required: Two
3930- 659-10).
References:
Tools/Test Equipment:
TM 10-3930-659-10
General mechanic's tool kit (Item 44, Appendix F)
STE/ICE (Item 35, Appendix F)
a.
ENGINE IDLE SPEED ADJUSTMENT
1.
Connect STE/ICE equipment (see paragraph 4-4).
2.
Remove nut (5) and accelerator cable (7) from fuel Injection pump lever (4).
3.
Start engine and run at engine idle speed (see TM 10-3930-659-10).
4.
Hold fuel Injection pump lever (4) toward radiator and read STE/ICE digital display. Engine idle speed
should be 775-825 rpm ("slow idle speed").
NOTE
Perform steps 5 through 8 only if slow Idle speed Is not within specification.
5.
Loosen locknut (3) and turn screw (2) counterclockwise one or two turns. Tighten locknut.
6.
Loosen locknut (10) and turn screw (1) until slow idle speed is within specification.
7.
Loosen locknut (3) and turn screw (2) until engine idle speed begins to increase, then turn screw
counterclockwise one full turn. Tighten locknut.
8.
Tighten locknut (10).
9.
Hold fuel Injection pump lever (4) away from radiator and read STE/ICE digital display. Engine idle
speed should be 2350-2400 rpm ("fast idle speed").
5-72
|