| |
TM 10-3930-659-20
22-8.
PREPARATION OF EQUIPMENT FOR AIR SHIPMENT (Cont).
12.
Remove on-board crane hook from cab lifting bracket and place on-board crane In stowed position (see TM 10-
3930-659-10).
13.
Adjust driver's seat and steering wheel for operation (see TM 10-3930-659-10).
14.
Install muffler (see paragraph 5-27).
NOTE
Raise forks until free of boom stop.
15.
Start engine and raise forks (see TM 10-3930-
659-10).
16.
Position boom stop (19) rearward and lower
forks to ground (see TM 10-3930-659-10).
17.
Shut down engine (see TM 10-3930-659-10).
FOLLOW-ON TASKS:
Install front windshield wiper arm (see paragraph 16-6).
Install cab door (see paragraph 14-2).
Install counterweight (see paragraph 13-3).
TA706792
22-12
|