| |
TM 10-3930-659-20
19-1.
HYDRAULIC OIL LEVEL SIGHT GAGE REPLACEMENT (Con't).
b.
INSTALLATION
Install two new preformed packings (6), window (4), and spacer plate (3) on hydraulic reservoir (5) with four new
lockwashers (2) and screws (1).
FOLLOW-ON TASKS:
Fill hydraulic reservoir with hydraulic fluid (see LO 10-3930-659-12).
TA706781
19-2
|