TM 10-3930-659-20 18-4. 110-VOLT JUNCTION BOX REPLACEMENT (Con't). 4. Remove three nuts (9), screws (11), 110-volt AC receptacle (7), and gasket (10) from right engine lower sideshield (8). b. INSTALLATION 1. Install gasket (10) and 11 O-volt AC receptacle (7) on right engine lower sideshield (8) with three screws (11) and nuts (9). 2. Install 110-volt junction box (2) on right engine lower sideshield (8) with four screws (1), washers (3), and nuts (4). 3. Install plug (6) on 110-volt AC receptacle (7). 4. Install six plugs (5) on 110-volt junction box (2). FOLLOW-ON TASKS: Close right engine upper sideshield (see TM 10-3930-659-10). Install conveyorized fork attachments on side of forklift truck (see paragraph 17-13). TA706777 18-9

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business