| |
TM 10-3930-653-14&P
8.
Jack the inner rail or lift the rail with a hoist enough
to get access to the main chain anchor blocks in
back of the inner channel.
9.
Remove the chains, the blocks and the hose
mounting bracket.
9A. Now the inner channel can pass below the middle
channel.
10. Lower the inner channel to gain access to top and
bottom rollers and the top wear plates. Replace or
adjust as necessary.
4-196
|