| |
TM 10-3930-653-14&P
4. Hydraulically raise the inner channel above the top
carriage rollers.
5. Back the Forklift away from the carriage enough so
you can remove the cotter pin and lock nuts from
each chain anchor at the carriage. Now you can
move the forklift independently of the carriage.
6.
Carriage rollers are now accessible for
replacement and or adjustment.
7. Place the forklift on stands or over a mechanics pit,
if available.
4-195
|