| |
TM 10-3930-653-14&P
REASSEMBLY AND ADJUSTMENT
Reassemble differential in the sequence opposite to disassembly. The following requirements given below should be
observed.
Reassembly should be performed in a clean orderly area and due care exercised to prevent the possibility of
dirt and foreign matter entering the unit Also be careful not to damage parts when assembling them.
Make certain all parts are free of dirt, foreign matter, etc. New bearings should be unpacked just before
installation. When Installing new bearings, do not wash the grease off them.
Sliding sections of each part should be lubricated with gear oil lust before installation.
(1) Drive ball bearing on cross case halves.
Fig. 4-416. Installing Ball Bearing
(2) Install pinion gears and side gears on cross case
half. Adjust the backlash using thrust plates
properly.
Std backlash: 0.15-0.25 mm
(0.006-0.01 in)
Fig. 4-417. Installing Pinion Gears
(3) Align shaft hole with cross case hole correctly, and
install pinion shaft knockout pin from the correct
side.
Fig. 4-418. Installing Knockout Pin
(4) Assemble both cross case halves with lock bolts.
Tighten bolts to the specified torque evenly and
bend tangs of lock plates.
Bolt torque: 4.8-6.4 kg-m
(34.7-46.3 ft-lbs)
Fig. 4-419. Installing Ring Gear and Cross Case Halves
4 - 193
|