| |
TM 10-3930-643-34
GENERAL SUPPORT TRANSMISSION MAINTENANCE. (cont)
15-8.
Transmission Scheduling Valve. (Sheet 6 of 7)
ASSEMBLY
16.
17.
18.
19.
20.
21.
22.
Using a 3/16 socket head screw key,
install plugs (50 and 49) to body
(51).
Install new preformed packing (48)
and sleeve (47).
Install sleeves (46 thru 44), only if
inspection proved
necessary to
remove.
Install new preformed packings
thru 41), spool (40) and spring
Install sleeve (38).
(43
(39).
Using a 1-1/2 socket and torque
wrench, install new preformed packing
(37), piston (36), spring (35) and
retainer (34). Tighten retainer (34)
to 50 to 60 lb-ft.
Using a 1 socket and torque wrench,
install ring (33), new preformed
packing (32), retainer (31) and check
valve (30).
Tighten check valve (30)
to 30 to 35 lb-ft.
Go to sheet 7
15-100
|